CONSTRUCTION OF A HEALTH HOUSE  Levet (18) 

CLIENT

City Hall of Levet

 

COST

1 280 000  € HT

 

AREA

830 m2 SP - 821 m2 SU

 

COMPLETION DATE

2018

 

ARCHITECT'S APPOINTMENT

Standard Appointment + Fluids and Electricity Production Documentation + Construction Management

 

ARCHITECTS

BLATTER SAS D'ARCHITECTURE - Principal Architect

 

CONSULTING ENGINEER

SEITh - Fluids Engineering, Thermal Engineering, SSI (fire safety system)

 

 

x

PROJECT LOCATION

 

18340 LEVET

x
x